Leitner Shriram wind turbine plant goes on streamSeptember 25th, 2009 CHENNAI - Leitner Shriram Manufacturing's new wind turbine plant, set up near here at an investment of Rs.200 crore, was formally commissioned Friday. Leitner Shriram, a 51:49 joint venture between Italian group Leitner and city-based Shriram EPC, makes 1.5 MW class wind turbines at the new facility, while its existing plant in Puducherry makes 250 KV wind turbines.
Maran to inaugurate Gujarat Eco Textile Park in SuratSeptember 8th, 2009 NEW DELHI - Union Textile Minister Dayanidhi Maran will inaugurate the Gujarat Eco Textile Park setup under the Scheme for Integrated Textile Parks (SITP) at Surat on Wednesday. The park has been set up in an area of 104 acres, at a cost of Rs.
Torrent starts output from final phase of Gujarat power unitAugust 17th, 2009 MUMBAI - The $1 billion power and healthcare major Torrent group has started commercial production of electricity under the final phase of the Rs.3,600 crore Sugen power plant in Gujarat that will cater to its customers in Ahmedabad, Gandhinagar and Surat. Like the first two phases, the third stage of the unit is also generating 382.5 MW, taking the total capacity to 1,147.5 MW, the company said in a regulatory filing with the Bombay Stock Exchange.
Astonfield-Areva to develop 100 MW biomass assets in IndiaJuly 29th, 2009 KOLKATA - The US-based Astonfield Renewable Resources Limited has set its eyes on non-conventional energy generation in India by exploiting offshore wind, tidal and concentrated solar energy resources, a top company official said here Wednesday. "We're very interested to explore offshore wind, tidal energy and solar thermal to generate renewable power in India," Astonfield Management Inc co-chairman and director Sourabh Sen said.
New Mexico company plans to build utility-scale, zero-emissions hydrogen plantJuly 15th, 2009 New Mexico company to develop hydrogen power plantALBUQUERQUE, N.M. — A New Mexico-based energy technology company says it plans to develop what it calls the world's first utility-scale, zero-emissions hydrogen power plant.
Tamil Nadu wants more power from upcoming Tuticorin plantJune 22nd, 2009 CHENNAI - Energy-starved Tamil Nadu wants a higher share of power that will be generated by the joint venture it has set up with mining and power company Neyveli Lignite Corp (NLC). A similar demand had earlier been raised by Gujarat, where NLC proposes to set up a 1,000 MW plant at Valia, also in joint venture with that state's power board.
Indian Oil's Gujarat wind power project is readyMay 13th, 2009 KANDLA - Public sector refiner Indian Oil Corp (IOC) has completed its 21 MW wind power project near the port town of Kandla, a top official said Wednesday. The wind farm, set up at a cost of Rs.130 crore, would be formally inaugurated later this week, the IOC official, who did not want to be named, told IANS.
GAIL plans wind energy projects in GujaratMay 12th, 2009 AHMEDABAD - Gas marketing major Gail India is planning to establish a series of wind power projects in Gujarat during the current fiscal, a senior official said Tuesday. 'The company has invited bids for setting up wind power projects of 4.5 to 5 MW capacity each on a turn-key basis.
Power plant workers go on rampage after co-worker's deathMay 7th, 2009 MUNDHRA - Police lobbed tear-gas shells and fired several rounds in the air to quell a mob of about 500 workers who went on a rampage at a power plant in Kutch region of Gujarat following death of a worker after he slipped from a crane, police said Thursday. Workers at the the Adani Group's power plant in Shiraya resorted to stone pelting and damaged three vehicles and set another vehicle on fire to protest the death of a worker after he slipped from a crane used for cleaning a chimney.
Tat Steel commissions 120 MW gas-based plantMay 6th, 2009 JAMSHEDPUR - Industrial Energy Ltd (IEL), a joint venture between Tata Steel and Tata Power, Wednesday commissioned a 120-MW power plant that will run on waste gas produced by the steel major. The plant, built at an investment of Rs.490 crore, will supply the entire generated power to Tata Steel to help the company meet its growing power requirements in its Jamshedpur unit, an official statement said.
Tata Power begins commercial operations at Mumbai plantMarch 30th, 2009 MUMBAI - Tata Power has commenced commercial operations of a 250 MW coal-based thermal unit at the Trombay Thermal Power Station, it said here Monday. With this, the Trombay plant's generation capacity will be increased to 1,600 MW from 1,350 MW, the company said in a regulatory statement.
IDFC signs deal to build thermal, solar plants in GujaratJanuary 12th, 2009 NEW DELHI - The infrastructure development arm of a leading finance company in the infrastructure space Tuesday announced that it had signed two memorandums of understanding (MoUs) with Gujarat state government to build a thermal and solar power plant. A statement from Infrastructure Development Finance Company Ltd.
Reliance ADAG to invest Rs.105 bn in GujaratJanuary 12th, 2009 AHMEDABAD - The Reliance Anil Dhirubhai Ambani Group (ADAG) Tuesday signed three memorandums of understanding (MoUs) worth Rs.105 billion (Rs.10,500 crore or $2.13 billion) for its proposed projects in Gujarat. Group chairman Anil Ambani said the investments would be made for building a port jetty in Saurashtra, a power plant and three cement factories.
Vibrant Gujarat meet sees massive investments in energy sectorJanuary 11th, 2009 AHMEDABAD - The 4th Vibrant Gujarat global investors summit which began Monday set a record of sorts with 114 MoUs entailing a capital investment of over Rs.3.4 trillion (Rs.349,752 crore) in the energy sector alone being signed on the first day of the two-day event. The MoUs were inked in the presence of Gujarat Chief Minister Narendra Modi and a large number of captains of energy sector from across the world.
Vibrant Gujarat to attract investments in renewable energyJanuary 10th, 2009 AHMEDABAD - The two-day fourth Vibrant Gujarat Global Investor Summit starting here Monday is likely to see a record number of investment proposals in renewable energy, particularly in the solar and wind energy segment, a senior state minister said Sunday. 'The state government has received very good response in all four major sectors with several new and key players of the industry expressing their willingness to take advantage of the benefits being offered by Gujarat as the ideal investment destination,' Energy and Petrochemicals Minister Saurabh Patel said.
June 27th, 2009 at 1:18 pm
Respected Sir,
I wish to apply for the above-mentioned position in your prestigious company with my experience and qualification and enclosed here with is my comprehensive biographical data for your perusal.
I am working with DSIL, Dwarikeshpuram , 24MW CO-GEN Power Plant. But Presently I am workimg in Badarpur Energy Pvt. Ltd. Distt.-Karimganj, Assam in 6 MW Power Plant.
I have a total 2 years of experience in the 24 MW CO-GEN power plant operation & maintenance & also have 1 year working experience in 6 MW Capative Biomass based Power Plant . In field of Electrical.
If you find qualification and experience comply with your requirements, I can assure you of best services at all the times. Hope this will merit your kind consideration and thanking you in anticipation.
Faithfully Yours
_____________
Amit Kumar Singh
Date: ________
ENCL:-RESUME
RESUME
AMIT KUMAR SINGH Current Address-
E. mail:amitsingh927@yahoo.co.in SHRI R.B.SINGH
JAHANGIR PURI
Mob:09859277406 House No-(I-456)
NEW DELHI-110022
09837633698(HOME)
CAREER OBJECTIVE-
To improve effectively & utilize my skills in a good professional environment.
PREVIOUS JOB PROFILE- I am working with M/S Dwarikesh sugar industries ltd.Afzalgarh
Distt-Bijnor(U.P.)-246722 as a Electrical Enggineer(Power plant from 04th june 2007 .
EXPERIENCE(PREVIOUS)
Post Hold : Graduate Engineer Trainee.
Organization : DSIL,Dwarikeshpuram Afzalgarh Bijnor(u.p.)-246722
Period : june2007 to jan2008.
Working as a shift Engineer (power House& utility) from june2007 to december2009.
Presently I am working in Badarpur energy pvt.ltd. for 6 MW co-gen power plant in shift engineer for 10 january till now.
COMPANY PROFILE:-Dwarikesh sugar Industries Ltd., sugar (60+60 Tph), Having(24MW) CAP. Co-Gen. Steam power plant and 120Tph.
TECHNICALQUALIFICATION
Course : B.Tech (Electrical & Electronics Engg.)
Institute : B.I.T.M. Nagar(U.P.)
University : U.P.Tech.University Lucknow. (U.P.)
Agg. %tage : 62% (2003-2007 Batch.)
PREVIOUS JOB RESPONSIBILITY:-
• To achive target of self generation
• Redistribution of load according to the requirement
• To attained the instantaneous problem by study drawing to avoid plant breakdown and M/C Stoppage
• Preparation of power report, according to ERP format of Daily basis and Monthly basis
• Responding to higher authority about the daily achievements, power generation and breakdowns
• Preparation of check sheet (11KV S/S,Generators,Transformers,Capacitors &ESP)
• Monitoring of critical equipments(11KV S/S,Generators, Transformers, Capacitorts & ESP)
• Distribution jobs to electricians accordingly to requirement
• Look after the electrical safety rules during maintenance job.
• Development and modification and proper drawing.
EQUIPMENT HANDLE:-
1. Generation- 24MW/30,000KVA TDPS Make Alternator with Steam turbine(Siemens Make) Extraction Cum bleed Cum Condensate & (3+3+3+2.50MW) LT Turbine(Make triveni)
2. Operation & Maintenance:-
• AVR, (ABB Make) 11KV Generator Protection panel (SIEMENS Make) Battery Charger, 11KV NGR Panel ,11KV LASCPT Panel & Boiler(120Tph).
• L.T. PCC 440V Make Unilec.
• AC/DC Drives (Siemens & L&T Make) upto 700&1000HP.
• Soft Starter, D.O.L., Star-Delta Starter & all types of starter.
• Transformer upto 3.5 MVA(11KV/440V)
• D.G.Sets(1*320KVA,2*500KVA,1*1010KVA)Make Cattert piller &Jakson.
• Cranes upto 5 Ton. & Compressor.
• 11KV/132KV Substations.
• H.T, L.T., Transmission &Distribution of plant.
• VCB,ACB,SF6 Ckt Breaker Realeys, Contractors etc.
• MCCs,AC Motors upto 700HP.
• Familiar with all interloking ckt. & process automation system in continous process industries.
• PLC(Alpha),DCS(Yokogawa,Centum Cs 3000)
COMPUTER PROFICIENCE:-
Proficient with windows 2000, XP, “C” “C++” Language MS office world, MS officeExcell & well familiar with Internet.
PERSONAL PROFILE:-
Father’s Name : Shri Kamal Dev Singh
Date of Birth : 27-07-1986
Sex : Male
Material Status : Single
Hobbies : Reading & Listening Music.
Permanent Address : DSIL,DWARIKESHPURAM,AFZALGARH
House no-E-20, Bijnor(U.P.)-246722
Cell : 09859277406
Extra Curriculum Activity : Member of organization Committee
of Cultural & literary Function of
College.
Strength : Discipline,Hard work, & Dedication &
Team worker.
Salery Expected : NEGOITABLE.
Declaration:-
I Solemnly declare the details furnished above are true to
my conscience and brief.
Date:______________
Place: _____________ ( AMIT KUMAR SINGH)
July 16th, 2009 at 10:28 am
Sanjay Kumar Gupta
Contact Information:
Address :-
Cax-26, 1st floor, behind axis bank Atm, 6th wadi, Adipur-370205.
Gandhidham, Gujarat
Contact No:
+91-9227706714
+91-9621128040
Email: sanjay7284@yahoo.com
Sanjay7783@gmail.com
Permanent Address:
220 Agnihotra Nagar Near Cng Gas plant Makdikhera, Kanpur-208002
Personal Data:
DOB : 07-10-1986
Sex : Male
Nationality : Indian
Marital Status: Single
Languages Known:
English, Hindi
Hobbies:
Singing
Dancing
listening music
playing cards.
Preferences:
Willing to relocate
Specialization: Finance
Objective
To work in a challenging dynamic environment to keep adding value to myself and simultaneously contribute to the growth and success of organization and society.
Professional Qualification
MBA (PGDM) Fresher Passed With 72%
International Institute of Management Studies, Pune. Fall Batch 2007-09
Concentrating in
Finance
Academic Record
Master of Commerce (C.S.J.M. University)
From V.S.S.D college, Kanpur
Passed with 62% marks.
Year of Passing 2006
Major subjects Included Management, Accounting.
Bachelor of Commerce (C.S.J.M university)
From P.P.N.P.G. college, Kanpur
Passed with 58% marks.
Year of passing 2004
Major subjects Included Management, Accounting.
Intermediate (10+2) in the year of 2001
Higher Secondary: from U.P. Board (B.N.S.D Inter college Kanpur)
Passed with 64% marks.
Done in Commerce Stream.
High School: from U.P. Board (B.N.S.D Inter college Kanpur )
Passed with 60% marks.
In the Year 1999
Winter Training
Company Name / Jindal Group
Project Title : Ratio Analysis
Project profile : How the company invest their capital
Analyze the financial status.
Understand the manufacturing setup of the company.
Summer Training
Company Name:- COUNTRY CLUB (INDIA) LTD.
Project Title : Financial Analysis of Country Club ( India) Ltd.
Project profile : Various factor of clubbing industry.
Analysis the various type of operations of CCIL.
How the company invest their capital.
Analysis the financial problems of CCIL.
Computer Proficiency
MS Office
Internet
Tally 7.2(certificate in computer accounting).
Competencies & Skills
Good communication skill
Fast learner.
Positive attitude.
Adaptable as per working environment.
Achievements & Awards
Won lots of medals in sports competition at school and collage level.
Won a price at district level for dance
Declaration
I confirm that the information provided by me is true to the best of my knowledge and belief.
Place : _____________________
Date : Signature
September 9th, 2009 at 1:03 am
CURRICULUM VITAE
I AM COMPLETD BE.ELECTRICAL WITH 68.33%. I AM FRESHER.
PERSONAL INFORMATION
Name : MANIYA KAMLESH HARJIBHAI
Father’s Name : HARJIBHAI KURJIBHAI
Date of Birth : 17 JUNE 1987
Place of Birth : SURAT (INDIA)
Sex : Male
Nationality : Indian
Languages Known : English, Hindi & Gujarati.
Permanent Address : 36, Rajlaxmi Society
Puna road, kapodra, Varachha.Surat-395006
Present add : 36, Rajlaxmi Society.
Phone No. : 91 9327486027
E-mail : maniya.kamlesh@gmail.com
ACADEMIC PERFORMANCE
Completed B.E. 8th Sem. Electrical engg. From Govt. Engg. College, Surat, Gujarat (South Gujarat University)
v EXPERIENCE : FRESH
Examination Board/University Month/Year Percentage Scored
VIII Semester V.N.S.G.U Jun-09 68.88%
VII Semester V.N.S.G.U Dec- Jan,09 67.77%
VI Semester V.N.S.G.U July, 08 62.33%
V Semester V.N.S.G.U Nov-Dec.07 52.33%
IV Semester V.N.S.G.U Dec,06 50.11%
III Semester V.N.S.G.U July,06 52.77%
I Year V.N.S.G.U May,06 50.12%
Aggregate 56.80%
H.S.C. G.S.H.S.E.B 2004 63.38%
S. S. C G.S.E.B. 2002 80%
PROJECT PROFILE
Major project : Device control through FM transmitter (Wireless telemetry)
Seminar : Plastic Battery
INDUSTRIAL VISIT
Hydro Power Station, Ukai
ABB Vadodra
Jyoti Switchgear Ltd Anand
ERDA Vadodra
SKILL SETS
Programming Languages : C, Basics.
Operating Systems : Microsoft Windows (98, 2000, XP), MS Office
: 8085 Assembly Language (Micro Processor).
HOBBIES
Reading News Paper & Magazines, Making New Friends, Music, Traveling, Sports.
STRENGTHS
I have my own potential.
I am a creative person and I can try my best to adjust with the situation going around me.
I am a very enthusiastic personality and who takes hard situation as a part of game.
I am a team person & love does work in team.
DECLARATION
I hereby declare that the above stated facts are true and complete to the best of my knowledge and belief.
( MANIYA KAMLESH HARJIBHAI )
September 10th, 2009 at 1:04 am
CURRICULUM VITAE
PERSONAL INFORMATION
Name : MANIYA KAMLESH HARJIBHAI
Father’s Name : HARJIBHAI KURJIBHAI
Date of Birth : 17 JUNE 1987
Place of Birth : SURAT (INDIA)
Sex : Male
Nationality : Indian
Marital Status : Married
Languages Known : English, Hindi & Gujarati.
Permanent Address : 36, Rajlaxmi Society
Puna road, kapodra, Varachha.Surat-395006
Present add : 36, Rajlaxmi Society.
Phone No. : 91 9327486027
E-mail : maniya.kamlesh@gmail.com
ACADEMIC PERFORMANCE
Completed B.E. 8th Sem. Electrical engg. From Govt. Engg. College, Surat, Gujarat (South Gujarat University)
v EXPERIENCE : FRESH
Examination Board/University Month/Year Percentage Scored
VIII Semester V.N.S.G.U Jun-09 68.88%
VII Semester V.N.S.G.U Dec- Jan,09 67.77%
VI Semester V.N.S.G.U July, 08 62.33%
V Semester V.N.S.G.U Nov-Dec.07 52.33%
IV Semester V.N.S.G.U Dec,06 50.11%
III Semester V.N.S.G.U July,06 52.77%
I Year V.N.S.G.U May,06 50.12%
Aggregate 56.80%
H.S.C. G.S.H.S.E.B 2004 63.38%
S. S. C G.S.E.B. 2002 80%
PROJECT PROFILE
Major project : Device control through FM transmitter (Wireless telemetry)
Seminar : Plastic Battery
INDUSTRIAL VISIT
Hydro Power Station, Ukai
ABB Vadodra
Jyoti Switchgear Ltd Anand
ERDA Vadodra
SKILL SETS
Programming Languages : C, Basics.
Operating Systems : Microsoft Windows (98, 2000, XP), MS Office
: 8085 Assembly Language (Micro Processor).
HOBBIES
Reading News Paper & Magazines, Making New Friends, Music, Traveling, Sports.
STRENGTHS
I have my own potential.
I am a creative person and I can try my best to adjust with the situation going around me.
I am a very enthusiastic personality and who takes hard situation as a part of game.
I am a team person & love does work in team.
DECLARATION
I hereby declare that the above stated facts are true and complete to the best of my knowledge and belief.
( MANIYA KAMLESH HARJIBHAI )